Linear Rails

Materials

Hardware Qty
MGN9H-300 Linear Guide 4
MGN9H-450 Linear Guide 2
M3 Roll-In Nut 46
M5x8 SHCS 46

Animated Assembly

Steps

The spring in some of the roll-in nuts may not fully engage with the extrusion, allowing the nuts to slide freely in the slots. Try pushing the ball in the nut a few times to work it in, or try a different nut. There should be quite a few extras in the kit.

1. Attach the Front Z-Rails to the Frame

  • Keep two rubber stoppers in the ends of the linear rails to keep the carriages on for now
  • Place 7 M3 Roll-in Nuts into the front vertical extrusions, using the MGN9H-300 Linear Guide to align the nuts
  • Loosly fasten the MGN9H-300 Linear Guide to the extrusion using 7 M3x8 SHCS
  • Push the rail against the bottom extrusion and remove the rubber stoppers
  • Move the carraige out of the way and press on the two printed Linear Rail Alignment tools near the ends of the rail
  • Tighten the fasteners while holding the alignment tools in place

Take care not to overtighten the linear rail screws. Snug is good. Blue Loctite may be used here.

  • Remove alignment tools

2. Attach the Rear Z-Rails to the Frame

  • Repeat the process for the rear Z-rails

3. Attach the Y-Rails to the Frame

  • Use the Y-Rail Alignment Tool to ensure correct location