Front Z Joints

Materials
| Hardware (for each side) | Qty |
|---|---|
| Extrusion 2020-320 | 1 |
| M3x10Lx6W Hex Standoff (Coupling Hex Nut) | 2 |
| Spherical Bearing - GE5C | 1 |
| M5x20 BHCS | 1 |
| M5x40 BHCS | 1 |
| M3x16 SHCS | 4 |
| M3x25 SHCS | 4 |
| M3x35 SHCS | 2 |
| M3x40 SHCS | 2 |
| M3x5.7 Brass Insert | 2 |
| M3x4.3 Brass Insert (4.5) | 2 |
| M5 Roll-In Nut | 1 |
| [*Side B Only M3x10 SHCS] | [1] |
Animated Assembly
Assembly Notes
- 1:10 Both The M5x20 BHCS and M3x10 SHCS thread into plastic. They will be used to adjust the height of the Z Joints when the endstop and safety switch are triggered, respectively. Skip the glue until that calibration is done. Side A has no M3x10 SHCS safety switch position screw, so the Endstop Adjustment printed part looks a bit different on side A and B.
- 2:40 If it’s tricky to slide the Z Joints into the extrusion with the roll-in nuts attached, just unscrew them and insert them into the extrusion first.
- 2:43 This can be dialed in later when the Front Z Joints are attached to the rails.