1:24 Make sure this wheel can rotate with a light push on the silicone band. This will plug the nozzle when it’s heating, cooling, or paused.
1:26 You’ll need to cut a 3x4 section of the Silicone Brush. Keep the remaining piece for spares.
2:19 The Nozzle Cleaner should be installed such that it doesn’t interfere with the Front Z Joints when they are raised until their carriages are at the top of their rails. This module’s vertical position will be adjusted in the Checks and Calibration Section.